Walk the plot once. Leave each trade a clear list.

Record every snag with its photo, location, trade and issue number, then filter the walk into focused lists for the people fixing it.

CONSTRUCTIONPRJ-0007
41

open issues
ready to assign

IS-041Sealant missing at frameOPEN
IS-040Door leaf overpaintOPEN
IS-039Trap joint remadeRESOLVED

Construction: snagging & handover QA

The situation

A plot walk produces sixty snags across eight trades. Today that's a notebook, two hundred camera-roll photos, and an evening in Excel matching one to the other, then a week of "which door did you mean?" calls.

With Snagwalk

  • Walk once, capture everything. One photo per snag, marked up on the spot and numbered IS-001 onwards in walk order.
  • Contractor packs by trade. Filter to Electrical, generate, send. Mason Ltd gets their twelve items, numbered and photographed, and nothing else.
  • Re-inspection is the same walk, shorter. Work the open list, mark resolved, capture the after photo. What's still open is the agenda for the next meeting.
  • Close-out you can hand to the client. The final inspection report shows what was raised, what remains outstanding and what has an after photo; the record practical completion turns on.

Built for site conditions

No signal in the core? Doesn't matter: capture and reporting work fully offline. The list remains available in the unfinished parts of the site where coverage usually drops out. (Why that happens, and how to prepare for it: running inspections with no signal.)

Vocabulary that matches yours

Trades, plots, references, priorities, walk order. Record IDs stay stable from first walk to final account, so the site team, office and contractor can refer to the same item.

ENDNEXT WALK

Use it on your next plot walk.